Expressway Tower – Building work 10/27

Saturday, October 27th

  • Weather issues have prevented us from finishing the parking lot striping on the south side of the building, but we are hoping to wrap this up on Saturday. If you plan to be in the building on Saturday, please park on either the east or west side, or at the Aquatics Center.
  • We will be shutting off the building water at 5pm for a very short maintenance test. We expect service to be restored within one hour.

Ashlea Palladino, CFM, FMP | Associate Director, Property Management

 

This entry was posted in Parking Lot, Water Shutoff. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *